The launch of the E371 Restoration Project was part of the Railway's Annual General Meeting (AGM) held on 29th August 2026.

Members were briefed on the need to restore a third steam engine and why E371 was preferred to the restoration of either K157, D3 619 or D3 646. The reasons that were explained to members included:
The cost of restoration
The condition of the boilers on each of the four locomotives
The anticipated cost of restoring each locomotive
The ongoing maintenance requirements, once operational